Timely Prefinished Steel Door Frames Installation Instructions
Timely industries products pages present complete specifications and details about our prefinished steel door frames.
Timely prefinished steel door frames installation instructions. Sleeve the transom mullion over the brackets sleeve the transom mullion over the bracket on each jamb and insert the self drilling screw through the small hole in the transom mullion and into the pre drilled hole in the bracket. A division of s d s. Available in both door sizes. Create an equal gap between the door and frame at the strike location and fasten.
This page is the overview of all frames. Prefinished steel door frames. Beginning at the head center the header casing in the opening and snap it over one clip in the center. Minimum 6 drywall screws recommended.
Timely industries is the leading manufacturer of prefinished steel door frames outperforming other door frames with lower opening costs. When installing the timely frame in a steel stud wall the frame must be 1 8 wider than the stud size because the stud actually rests in a track section that is 1 8 larger than the stud dimension. Frame meets u b c 7 2 97 ul 10 c ul 1784 smoke rating cbc 7 2 1998 part 1 2. 2 from any end.
Fasten the remainder of the strike jamb at every clip on the door side only. All frames that are fire rated require a fire label. This creates instant wall growth. Timely prefinished steel door frames are an ideal solution for most interior commercial drywall applications.
No painting time and money saved. Like hollow metal drywall frames timely frames are installed in walls constructed with either wood stud or steel stud framing but are installed after the the drywall is applied and painted. Installation ease of installation installs over the finished wall no need to caulk mask or cut in painting installs at the end of the project eliminates construction damage to doors and frames and allows furnishings to be placed prior to door installation installs with the door as a template perfect alignment of. Align the miter and snap the upright casing over one clip at the top.
3 piece kd knocked down frame. We provide the 50 5 frame at the same price as a 47 4 7 8 to accommodate the larger wall size. Corporate office 818 492 3500 or. Install a casing corner piece in the upright casing and insert it into the header casing.
Pull the header tight to the strike jamb and apply a fastener at the corner of the header. 1 3 4 door 3 face header use with sub frame for cmu application 3 face no stop header use with standard frame for concealed overhead closer installation 3 face insert use for sub frame at head with standard frame in cmu glass stop or door panel can be applied to one or both sides of any mullion or jamb. Prefinished steel door frames.