Time Required Lay Hardwood Flooring
Acclimation hardwood floors how long.
Time required lay hardwood flooring. Luckily we are here to help you make the correct decision. Glue will typically set in about 60 minutes hold your trowel at a 45 degree angle spread the glue in small sections. Days 1 to 7. Typically a 2 person crew of installers can lay 750 to 1 000 square feet of flooring per day with the average size of a job being 1 000 to 1 500 square feet.
This will give the wood time to acclimate to your home s climate. If you re finishing wood floors on site you ll need to plan more time for the flooring to acclimatize as much as 5 7 days. Why it might be shorter. What seemed so intuitive at the store now seems overwhelming with the decision you must make on which direction to install your hardwood flooring.
If the house is newly constructed be sure the room is continually heated or air conditioned to a normal occupied temperature. Acclimation to the installation environment for solid wood floors should never be overlooked. Laying the flooring you can lay the flooring in a 10 by 20 foot bedroom or living room in two or three hours but you should add an hour or two to fit it around cabinets or other obstacles in a. After all this might be a decision you will have to live with for a long time.
On average it takes 1 3 days to install hardwood floor. While it s not as important for our engineered hardwoods due to the stability in the way they are constructed solids will expand and contract considerably given the right conditions with wide changes in relative humidity levels. Be sure to look for recommendations from the adhesive manufacturer. Here s a breakdown of that time frame plus factors that might make it shorter or longer.
The average time it takes to install hardwood flooring once it arrives at your home is 10 15 days about 7 for acclimation and the rest for installation and finishing the floors. Next lay the first row. Engineered floors are often installed using adhesives that have volatile organic compounds vocs that need to be evaporate prior to finishing. It will take less time to install hardwood flooring if the space is smaller than 1 000 to 1 500 square feet.